More vehicles on the existing grid connection

Peak shaving plans when chargers and batteries draw power, so the site’s peak stays low and fits the grid connection.

Electric truck at a charger with the depot peak lowered by 36%

The biggest grid challenge lasts just 15 minutes

The challenge is that the grid company bills the highest 15 minutes of the month. When all vehicles start charging at once, that one peak drives 20 to 30% of the depot’s energy bill.

Spreading the charging cuts the grid capacity a depot needs by over 40%. Operators add trucks without waiting years for a bigger connection. In Dutch and German grids, it decides whether a depot tender can be won at all.

Battery storage containers with a solar park and power lines behind

The power draw spread across the night

Peak shaving works out when the chargers or batteries on site draw power from the grid. It spreads that draw, so the peak stays low. BMB makes the plan. The charging or energy software carries it out.

Fleet charging providers, logistics companies, grid scale storage operators and battery swap station operators use peak shaving. It keeps them within the grid connection they already have.